Available Now: 2023 Schedule of Hazmat & RCRA Training
Search

Question of the Week: Calculating Generator Status

Posted on 1/21/2011 by James Griffin

Q. What is "generator status," and how do I calculate it?

A. Each and every person who produces hazardous waste is a generator and must determine his or her generator status each calender month. A facility’s generator status determines how stringently it is regulated and how long it may accumulate hazardous waste on site without a permit.

Three Categories of Waste Generator

Conditionally Exempt Small Quantity Generators (CESQGs) generate no more than 100 kilograms of hazardous waste per calender month [40 CFR 261.5(a)]. CESQGs are largely exempt from regulation, as long as they classify their waste and ensure that it is recycled or disposed of in an appropriate facility.

Small Quantity Generators (SQGs) generate more than 100 kilograms but less than 1,000 kilograms of hazardous waste per calender month [40 CFR 262.34(d)]. SQGs may accumulate hazardous waste on site without a permit for up to 180 days [40 CFR 262.34(d)].

Large Quantity Generators (LQGs) generate 1,000 kilograms or more of hazardous waste per calender month. LQGs may accumulate hazardous waste on-site without a permit for up to 90 days and have more paperwork obligations than SQGs [40 CFR 262.34(a)].

Don’t Count Wastes Not Subject to Substantive Regulation

As the following waste materials are not subject to substantive regulation, they do not count when calculating generator status:
  • Hazardous waste in manufacturing process units [40 CFR 261.4(c)]
  • Hazardous waste or tractability study samples [40 CFR 261.4(d), (e), (f)]
  • Ethyl alcohol, scrap metal, or petroleum refining wastes when recycled [40 CFR 261.6(a)(3)]
  • Empty hazardous waste containers [40 CFR 261.7(a)(1)]
  • Polychlorinated biphenyl (PCB) wastes managed under TSCA [40 CFR 261.8]
  • Hazardous wastes managed immediately on site in elementary neutralization units, wastewater treatment units, or totally enclosed treatment facilities [40 CFR 261.5(c)(2)]
  • Hazardous wastes recycled immediately without prior storage in an on-site process subject to 40 CFR 261.5(c)(3)
  • Used oil, spent lead-acid batteries, and universal wastes when managed under specific regulations [40 CFR 261.5(c)(4), (5), and (6)]
  • Wastes generated in laboratory cleanouts under 40 CFR Part 262 Subpart K [40 CFR 261.5(c)(7)]
Don’t Count Your Waste Twice

Generators must count their waste at the point of generation and should not re-count the same waste during the same calender month. This means that generators should NOT count when wastes are removed from a satellite accumulation area to a central accumulation area or when wastes are shipped off site. [40 CFR 261.5(d)]

If a generator reclaims hazardous waste for reuse on site, then the product and residues from the reclamation process do not count towards the generator status, as long as the hazardous waste was counted before reclamation. If the same stock of material is continually reused, then the generator must “count” the waste once a month [40 CFR 261.5(d)].

Tags: hazardous, RCRA, waste

Find a Post

Compliance Archives

Lion - Quotes

Having the tutorial buttons for additional information was extremely beneficial.

Sharon Ziemek

EHS Manager

The instructor took a rather drab set of topics and brought them to life with realistic real-life examples.

Tom Berndt

HSE Coordinator

The exercises in the DOT hazardous materials management course are especially helpful in evaluating your understanding of course information.

Morgan Bliss

Principal Industrial Hygienist

The instructor was very engaging and helped less experienced people understand the concepts.

Steve Gall

Safety Leader

Lion's online training is more comprehensive, has better slides, and is a superior training experience than what I would get from other trainers.

Robert Brenner

District Environmental Manager

I love that the instructor emphasized the thought process behind the regs.

Rebecca Saxena

Corporate Product Stewardship Specialist

Best course instructor I've ever had. Funny, relatable, engaging; made it interesting and challenged us as the professionals we are.

Amanda Schwartz

Environmental Coordinator

Lion was very extensive. There was a lot of things that were covered that were actually pertaining to what I do and work with. Great Job. I will be coming back in three years!

Tony Petrik

Hazmat Shipping Professional

Well designed and thorough program. Excellent summary of requirements with references. Inclusion of regulations in hard copy form, as well as full electronic with state pertinent regulations included is a great bonus!

Oscar Fisher

EHS Manager

Lion is easily and consistently the best option for compliance training. I've learned new information from every instructor I've had.

Rachel Mathis

EHS Specialist

Download Our Latest Whitepaper

Use this guide as a quick reference to the most common HAZWOPER questions, and get course recommendations for managers and personnel who are in need of OSHA-required HAZWOPER training.

Latest Whitepaper

By submitting your phone number, you agree to receive recurring marketing and training text messages. Consent to receive text messages is not required for any purchases. Text STOP at any time to cancel. Message and data rates may apply. View our Terms & Conditions and Privacy Policy.