Search

RCRA Training Requirements for VSQGs

Posted on 7/1/2026 by Lion Technology Inc.

While there is no explicit training requirement for very small quantity generator (VSQG) personnel, employees must know enough to remain in compliance with applicable hazardous waste regulations so as to avoid penalties and unwanted hazardous situations.

If a VSQG site does not comply with all regulations found in 40 CFR 262.14, it may be subject to more stringent regulations, such as the regulations for small or large quantity generators or the regulations for permitted treatment, storage, and disposal facilities, which are even more stringent.

Training requirements for small quantity generators and large quantity generators differ. If you are not sure of your site’s generator status, start here: How to Determine RCRA Generator Status.

Training Recommendations for VSQGs

For VSQGs, we strongly recommend RCRA training to ensure your facility can achieve and maintain compliance. VSQGs need to know:

  • Conditions for exemption for VSQGs [40 CFR 262.14].
  • Hazardous waste determination and recordkeeping [40 CFR 262.11(a)–(d)].
  • Generator category determination [40 CFR 262.13].

Stricter State-specific Regulations for VSQGs

State hazardous waste programs are required to be at least as stringent as the Federal RCRA regulations. Lion Membership (included with all Lion EH&S courses) provides access to Lion’s up-to-date summaries of each state’s hazardous waste regulations.

Examples of Stricter State Regulation

In California, the term “very small quantity generator” is defined in the regulations but is not a recognized generator category. VSQG sites in California follow California’s rules for small quantity generators (SQGs) at 22 CCR 66262.16.

In New Hampshire, if a VSQG wants to accumulate more than 200 kg of non-acute hazardous waste for longer than 90 days, its employees need to be “thoroughly familiar” with proper waste handling/emergency procedures [N.H. Admin. Rules, Env-HW 508.03(i)]. How do you prove familiarity?

RCRA Training for Very Small Quantity Generators

This RCRA training covers the keys to compliance with the EPA’s hazardous waste management standards for VSQGs. Managers and personnel who complete this course develop skills to navigate and apply hazardous waste, universal waste, and used oil regulations at a VSQG facility.

Tags: hazardous waste management, RCRA, RCRA Training

Find a Post

Compliance Archives

Lion - Quotes

The instructor was very very informative, helpful, understandable and pleasant. This course answered many questions I had, being new to this industry.

Frances Mona

Shipping Manager

Lion courses always set the bar for content, reference, and practical application. Membership and access to the experts is an added bonus.

John Brown, CSP

Director of Safety & Env Affairs

You blew the doors off the competition!

Stephen Bieschke

Facilities Manager

These are the best commercial course references I have seen (10+ years). Great job!

Ed Grzybowski

EHS & Facility Engineer

Very good. I have always appreciated the way Lion Tech develops, presents and provides training and materials.

John Troy

Environmental Specialist

The instructor was very knowledgeable and provided pertinent information above and beyond the questions that were asked.

Johnny Barton

Logistics Coordinator

This training broke down the regulations in an easy-to-understand manner and made them less overwhelming. I now feel I have the knowledge to make more informed decisions.

Amanda Oswald

Shipping Professional

My experience with Lion classes has always been good. Lion Technology always covers the EPA requirements I must follow.

Steven Erlandson

Environmental Coordinator

Lion courses are the standard to which all other workshops should strive for!

Brody Saleen

Registered Environmental Health Specialist

This is the best RCRA training I've experienced! I will be visiting Lion training again.

Cynthia L. Logsdon

Principal Environmental Engineer

Download Our Latest Whitepaper

This report details major changes for hazardous waste generators from US EPA’s Generator Improvements Rule, as well as the latest updates from states that are still working to adopt new, stricter Federal requirements.

Latest Whitepaper

By submitting your phone number, you agree to receive recurring marketing and training text messages. Consent to receive text messages is not required for any purchases. Text STOP at any time to cancel. Message and data rates may apply. View our Terms & Conditions and Privacy Policy.