Search

Are You Ready for This Year’s Annual Registration Deadline for Hazmat Shipments?

Posted on 4/19/2011 by James Griffin

Each year shippers and carriers of certain quantities and types of hazardous materials must comply with the registration requirements at 49 CFR 107, Subpart G. Registration, including a registration fee, is required for any person that offers or transports:
 
  • A highway route-controlled quantity of a Class 7 (radioactive) material,
  • More than 25 kg (55 pounds) of a Division 1.1, 1.2, or 1.3 (explosive) material,
  • More than one L (1.06 quarts) per package of a material extremely toxic by inhalation,
  • A shipment of a hazardous material in a bulk package with a capacity ≥ 3,500 gallons,
  • A shipment of hazardous materials that are subject to the placarding requirements at 49 CFR 172, Subpart F. [49 CFR 107.601]
The fee provides funds for grants distributed to states and Indian tribes for hazardous materials emergency response planning and training. 
 
Registration Deadline
Any shipper or carrier meeting the criteria at 49 CFR 107.601, must submit their registration no later than June 30 of each year for which they qualify. This registration must include a complete registration form (DOT Form F 5800.2) and accompanying fee [49 CFR 107.608]. The DOT now allows the submission of a registration form and fee electronically at https://hazmatonline.phmsa.dot.gov/services/haz_reg_1.aspx.
 
Fee
Since the registration fees are used to fund training and emergency response grants, they must revise the fee structure to assure that the registration program brings in only what is necessary for the grant program. The DOT published a final rule on March 30, 2010 revising the fee structure for the 2010 and subsequent registration years. Currently, registrants must pay a registration fee as follows:
 
Small business (as defined at 13 CFR 121)—$250
Non-profit organizations—$250
All other shippers and carriers—$2,575. [49 CFR 107.612(a)]
 
In addition to the standard fee, each registrant must also submit a $25 processing fee [49 CFR 107.612(a)(4)].
 
For more information on the DOT’s resources for hazmat registration see http://phmsa.dot.gov/hazmat/registration, or attend Lion Technology’s Hazmat Ground Shipper Certification (DOT) Workshop, coming soon to a city near you!
 

Tags: DOT, hazmat shipping

Find a Post

Compliance Archives

Lion - Quotes

Excellent job. Made what is very dry material interesting. Thoroughly explained all topics in easy-to-understand terms.

David Hertvik

Vice President

The instructor took a rather drab set of topics and brought them to life with realistic real-life examples.

Tom Berndt

HSE Coordinator

The price was reasonable, the time to complete the course was manageable, and the flexibility the online training allowed made it easy to complete.

Felicia Rutledge

Hazmat Shipping Professional

The instructor was very knowledgeable and provided pertinent information above and beyond the questions that were asked.

Johnny Barton

Logistics Coordinator

Lion is easily and consistently the best option for compliance training. I've learned new information from every instructor I've had.

Rachel Mathis

EHS Specialist

Best instructor ever! I was going to take my DOT training w/a different provider, but based on this presentation, I will also be doing my DOT training w/Lion!

Donna Moot

Hazardous Waste Professional

We have a very busy work schedule and using Lion enables us to take the course at our own time. It makes it easy for me to schedule my employees' training.

Timothy Mertes

Hazmat Shipping Professional

The exercises in the DOT hazardous materials management course are especially helpful in evaluating your understanding of course information.

Morgan Bliss

Principal Industrial Hygienist

Excellent. I learned more in two days with Lion than at a 5-day program I took with another provider.

Francisco Gallardo

HES Technician

The instructor made the class very enjoyable and catered to the needs of our group.

Sarah Baker

Planner

Download Our Latest Whitepaper

This report details major changes for hazardous waste generators from US EPA’s Generator Improvements Rule, as well as the latest updates from states that are still working to adopt new, stricter Federal requirements.

Latest Whitepaper

By submitting your phone number, you agree to receive recurring marketing and training text messages. Consent to receive text messages is not required for any purchases. Text STOP at any time to cancel. Message and data rates may apply. View our Terms & Conditions and Privacy Policy.