Search

Question of the Week: Using a Mass Balance Approach for RCRA Tanks

Posted on 5/24/2011 by Lion Technology Inc.

Q. Does a hazardous waste storage tank need to be emptied every 90 days (or 180 days), or can a ”mass balance approach” be taken?
 
A. EPA stated in the January 11, 1982 issue of the Federal Register (47 FR 1250) that generators must remove all wastes from the tank within 90 days from the time he first places waste in the “empty” tank. The discussion goes on to say that the tank is considered empty “when its contents have been drained to the fullest extent possible…but it is not expected that 100% of the wastes will always be removed.” 
 
The EPA recognized that tank systems do not always allow for complete drainage due to flanges, screens, or siphons. Therefore, as general guidance, the EPA stated that a tank is considered empty when “the generator has left the tank’s drainage system open until a steady, continuous flow has ceased.”
 
In October 12, 2006, the EPA was asked whether a “mass balance approach” was acceptable in proving that no waste was accumulated in a storage tank for more than the applicable time limit. In their answer, the EPA stated that their interpretation of 40 CFR 262.34(a)(1)(ii) does allow for this mass balance approach. 
 
The conclusion is that tanks can be operated in one of two ways: in a “batch process or in a continuous flow process.”
 
The batch process refers to when a tank would receive a “batch” of hazardous waste, or subsequent batches, and the tank is fully emptied within 90 days from the date the first drop of hazardous waste was placed in the tank. 
 
The continuous flow process is when a tank receives hazardous waste on an ongoing basis. In this scenario, the EPA discusses a “mass balance approach.” The “key parameters” for this approach take into account things such as: the daily throughput of hazardous waste, the time period the waste resides, and the volume of the tank. 
 
The EPA considered that under a continuous flow process where periodically emptying the tank is impractical, a generator could comply with the 90-day accumulation limit by measuring the volume of hazardous waste that flows into and out of the tank and showing that an amount of hazardous waste at least equal to the volume of the tank flows through during each 90-day period. This is called a“mass balance approach.”
 
Another important thing to note is that it is the generator’s responsibility to prove the continuous flow process does not allow waste to accumulate more than 90- (or 180-) days and meets all the requirements applicable to the tank. The EPA discusses examples of ways to prove this, such using equipment to monitor material entering and leaving the tank and recording the results. 
 
 

Tags: hazardous, RCRA, waste

Find a Post

Compliance Archives

Lion - Quotes

I can take what I learned in this workshop and apply it to everyday work and relate it to my activities.

Shane Hersh

Materials Handler

Lion does a great job summarizing and communicating complicated EH&S-related regulations.

Michele Irmen

Sr. Environmental Engineer

As always, Lion never disappoints

Paul Resley

Environmental Coordinator

I used the IT support number available and my issue was resolved within a few minutes. I don't see anything that could have made it better.

Danny Province

EHS Professional

The price was reasonable, the time to complete the course was manageable, and the flexibility the online training allowed made it easy to complete.

Felicia Rutledge

Hazmat Shipping Professional

The instructor took a rather drab set of topics and brought them to life with realistic real-life examples.

Tom Berndt

HSE Coordinator

Lion was very extensive. There was a lot of things that were covered that were actually pertaining to what I do and work with. Great Job. I will be coming back in three years!

Tony Petrik

Hazmat Shipping Professional

The exercises in the DOT hazardous materials management course are especially helpful in evaluating your understanding of course information.

Morgan Bliss

Principal Industrial Hygienist

This is the best RCRA training I've experienced! I will be visiting Lion training again.

Cynthia L. Logsdon

Principal Environmental Engineer

One of the best trainings I have ever received!

Brandon Morfin

EH&S Manager

Download Our Latest Whitepaper

Shipping papers are a crucial part of safely shipping hazardous materials. See the top 5 mistakes shippers make on shipping papers, and how to avoid them.

Latest Whitepaper

By submitting your phone number, you agree to receive recurring marketing and training text messages. Consent to receive text messages is not required for any purchases. Text STOP at any time to cancel. Message and data rates may apply. View our Terms & Conditions and Privacy Policy.