Search

Loading, Unloading, and Transloading Hazmat Rail Shipments

Posted on 2/21/2017 by Kim Folger

All Aboard! Did you know that more than 110 million tons* of hazardous materials are moved by train each year in the United States? Are you responsible for shipping, moving, or accepting rail shipments of hazmats?

If so, you are subject to the rules at 49 CFR Part 174, which regulate the loading, moving, and unloading of hazardous materials by rail. These rules—including DOT hazmat training requirements—apply to the railroad operators who transport the goods, shippers who prepare rail cars for transport, and receivers (consignees) who must properly unload the cars and prepare the “empties” for return shipping.
 
DOT hazmat rail shipment

Hazardous materials shipped by rail can be packed in drums, IBCs, or other bulk or non-bulk packagings packed inside box cars or strapped to flat cars. Hazmat shipped by rail can also be shipped in rail tank cars or, simply, “tank cars.” 49 CFR Part 174 lays out specific rules for each type of container that can be used to ship hazmat by rail. The rules for bulk and non-bulk packagings by rail are largely similar to the rules for shipping them by motor vehicle.

Shipping hazmat by tank car, however, is a little bit different.
 

Shipping Hazmat by Rail Tank Car

If you are using tank cars to ship hazmat, then you must load, unload, or transload them at some point. You’re probably aware of the terms “loading” and “unloading” already, and we will discuss these below.  

“Transloading” refers to the transfer of hazardous material (for the purpose of continuing the movement in commerce) from:
  • One bulk packaging to another bulk packaging (e.g., tank car to tank car);
  • A bulk packaging to a non-bulk packaging (e.g., tank car to drum); or ·        
  • A non-bulk packaging to a bulk packaging (e.g., drum to tank car).

When moving any kind of hazardous material from one container or package to another, the risk of a spill is very real. To prevent spills or accidents during loading, unloading, or tranloading of hazmat, DOT sets specific, unique requirements that hazmat employees must follow before, during, and after performing these job functions. 

Before Loading, Unloading, or Transloading [49 CFR 173.31]

Before a tank car can be loaded or transloaded:
1.       The shipper must choose an authorized tank car that meets all applicable specifications and is the right size and type for the material you’re shipping;
2.       The periodic inspection date marked on the tank car must be current; and
3.       The tank car must be inspected by the loader to ensure it’s in good condition for use.

And, before a tank car is loaded, transloaded, or unloaded, the following steps must be followed:
  • Ensure that all closures on the tank car are closed and made “tool-tight” by the use of a bar, wrench, etc.
  • Secure access to the tracks to prevent entry by other rail equipment.
  • Post caution signs between the rails.
  • Prevent the car from movement (setting handbrakes and blocking wheels).
  • Relieve tank car pressure (if applicable).
  • Securely attach connections before opening any valves.
These are just the steps that need to be taken before starting to load, unload, or transload a tank car.  
 

Loading, Unloading, and Transloading [49 CFR 174]

Trained operators are responsible for following specific written safety procedures when loading, unloading, and transloading tank cars. General rules for loading, securing, segregating, and separating hazardous materials must also be followed.  

For certain hazard classes—gasses , flammables, inhalation hazards, explosives, and radioactives—additional precautions must be taken. These materials are subject to more rules in 49 CFR 174 than other hazmat.  

While loading, unloading, or transloading hazmat to or from a tank car, the tank car is being loaded, unloaded, or transloaded, and with few exceptions while unloading equipment is attached, the tank car must either be:

1.       Attended by a designated hazmat employee who is physically present and has an unobstructed view of the operation; or

2.       Be monitored by a signaling system that is observed by a designated hazmat employee who is located either in the immediate area of the tank car or at a remote location within the facility.
 

After Loading, Unloading, or Transloading

When loading, unloading, and transloading is complete, all closures must be “tool-tight” and connections removed. If the tank car is going to be transported, it will need to be inspected again, and all rail cars carrying hazmats must be marked and placarded appropriately per 49 CFR 172.
 

Convenient DOT Hazmat Online Training for Rail Shippers

If you are responsible for loading, unloading, and transloading tank cars, or if you ship, carry, or receive hazmat by rail, keep up to date with these rules and more with Lion’s new Hazmat Ground Shipper—Additional Rail Requirements online course. Designed to meet DOT’s function-specific hazmat training, the course covers critical 49 CFR rules for shipping hazmat by tank car, freight container, IBC, and bulk or non-bulk packages by rail.
 
* 2012 United States Hazardous Materials Economic Census Transportation Commodity Flow Survey

Tags: hazmat shipping, Rail

Find a Post

Compliance Archives

Lion - Quotes

Excellent course. Very interactive. Explanations are great whether you get the questions wrong or right.

Gregory Thompson

Environmental, Health & Safety Regional Manager

The price was reasonable, the time to complete the course was manageable, and the flexibility the online training allowed made it easy to complete.

Felicia Rutledge

Hazmat Shipping Professional

The instructor did an excellent job presenting a very dry subject; keeping everyone interested and making it enjoyable.

Marc Bugg

Hazardous Waste Professional

The training was impressive. I am not a fan of online training but this was put together very well. I would recommend Lion to others.

Donnie James

Quality Manager

I really enjoy your workshops. Thank you for such a great program and all the help Lion has provided me over the years!

George Chatman

Hazardous Material Pharmacy Technician

This course went above my expectations from the moment I walked in the door. The instructor led us through two days packed with useful compliance information.

Rachel Stewart

Environmental Manager

The exercises in the DOT hazardous materials management course are especially helpful in evaluating your understanding of course information.

Morgan Bliss

Principal Industrial Hygienist

Lion provided an excellent introduction to environmental regulations, making the transition to a new career as an EHS specialist less daunting of a task. Drinking from a fire hose when the flow of water is lessened, is much more enjoyable!

Stephanie Weathers

SHE Specialist

One of the best trainings I have ever received!

Brandon Morfin

EH&S Manager

I can't say enough how pleased I was with this course! Everything finally makes sense.

Kim Graham

Lab Manager

Download Our Latest Whitepaper

This report details major changes for hazardous waste generators from US EPA’s Generator Improvements Rule, as well as the latest updates from states that are still working to adopt new, stricter Federal requirements.

Latest Whitepaper

By submitting your phone number, you agree to receive recurring marketing and training text messages. Consent to receive text messages is not required for any purchases. Text STOP at any time to cancel. Message and data rates may apply. View our Terms & Conditions and Privacy Policy.