Search

US Hazardous Waste Generators Submit 2020 Biennial Reports

Posted on 2/28/2020 by Ross Kellogg, CHMM

As part of its mission to protect environmental and human health, EPA tracks hazardous waste generation activity through a Biennial Report that large quantity generators must submit to state environmental agencies or regional EPA offices. The Biennial Report is due by March 1st of every even numbered year.

RCRA training workshops in SLC Chicago and Michigan

Who Must Submit a RCRA Biennial Report?

Currently, only large quantity generators of hazardous waste must submit the RCRA Biennial Report.

A large quantity generator of hazardous waste is any site that, in any single month:
  • Generated 1000 kg or more of non-acute hazardous waste
  • Generated or accumulated 1 kg or more of acute hazardous waste; or
  • Generated or accumulated 100 kg or more of spill cleanup material contaminated with acute hazardous waste.
Sites that meet any of these thresholds in even one month of the most recent odd-numbered year must report on all their hazardous waste activity from that entire year.

In other words, if your site met any of the above criteria during any month in 2019, you must submit a Biennial Report in 2020.  Biennial Reports submitted in 2022 will cover wastes generated in 2021, and so on.

What’s Required in the RCRA Biennial Report?

The Federal EPA requires that certain information be submitted on the Biennial Report form (EPA form 8700-13A/B).

The form includes information such as:
  • Facility’s EPA ID Number,
  • Facility’s name and address,
  • Quantity and nature of hazardous waste generated, and
  • Whether the hazardous waste was sent for recycling, treatment, storage, or disposal.
Under the RCRA Generator Improvements Rule, large quantity generators must also submit re-notification to EPA using Form 8700-12 in every even numbered year. LQGs may submit Form 8700-12 as part of the Biennial Report (40 CFR 262.18(d)(2)).
 
More at EPA’s website: 2020 EPA Biennial Report instructions and forms

Small Quantity Generators: New Re-notification Requirement

Small quantity generators (SQGs) and very small quantity generators (VSQGs) of hazardous waste are not required to submit Biennial Reports.

Starting in 2021, though, small quantity generators will be required to re-notify EPA of their generator status on September 21st of every fourth year (i.e., 2021, 2025, 2029, etc.). This re-notification requirement for SQGs was added as part of EPA’s Generator Improvements Rule as well. (40 CFR 262.18(d)(1)).

Even if your state has not yet adopted the RCRA Generator Improvements Rule, all generators of hazardous waste may be subject to additional state-specific reporting requirements. All generators should consult their state agencies to clarify the specific reporting requirements for that state.

Need a hand with your next RCRA Biennial Report? Lion provides expert consulting services for hazardous waste generators. We can help with reporting, RCRA compliance assessments, contingency planning, hazardous waste training, and more. Reach out to us today at Lion.com/Consulting for details  

2020 RCRA Hazardous Waste Training

For training on the latest RCRA regulations, join an expert instructor for the RCRA Hazardous Waste Management Workshop, coming soon to a city near you.
 
Salt Lake City Mar. 9–10
Grand Rapids Mar. 26–27
Chicago Mar. 30–31
St. Louis April 27–28
Dallas April 29–30
Houston May 4–5

US EPA requires annual RCRA training for hazardous waste personnel. Lion makes it easy to meet your RCRA training mandate in a variety of formats—nationwide public workshops, convenient online courses, live webinars, and on-site training.

Browse all RCRA training options here to find the course that fits your needs, your schedule, and your learning style.

Tags: biennial report, hazardous waste management, new rules, RCRA, reporting and recordkeeping

Find a Post

Compliance Archives

Lion - Quotes

The instructor was very knowledgeable and provided pertinent information above and beyond the questions that were asked.

Johnny Barton

Logistics Coordinator

I think LION does an excellent job of any training they do. Materials provided are very useful to my day-to-day work activities.

Pamela Embody

EHS Specialist

Lion's information is very thorough and accurate. Presenter was very good.

Melissa Little

Regulatory Manager

Lion's course was superior to others I have taken in the past. Very clear in the presentation and the examples helped to explain the content presented.

George Bersik

Hazardous Waste Professional

The course is well thought out and organized in a way that leads to a clearer understanding of the total training.

David Baily

Hazmat Shipping Professional

Lion courses always set the bar for content, reference, and practical application. Membership and access to the experts is an added bonus.

John Brown, CSP

Director of Safety & Env Affairs

Best course instructor I've ever had. Funny, relatable, engaging; made it interesting and challenged us as the professionals we are.

Amanda Schwartz

Environmental Coordinator

The instructor does a great job at presenting material in an approachable way. I have been able to save my company about $30,000 in the last year with what I have learned from Lion!

Curtis Ahonen

EHS&S Manager

I have attended other training providers, but Lion is best. Lion is king of the hazmat jungle!!!

Henry Watkins

Hazardous Waste Technician

Amazing instructor; real-life examples. Lion training gets better every year!

Frank Papandrea

Environmental Manager

Download Our Latest Whitepaper

This guide will help you identify 25 of the most -cited errors in RCRA training, recordkeeping, hazardous waste ID, container management, universal waste, and laboratories.

Latest Whitepaper

By submitting your phone number, you agree to receive recurring marketing and training text messages. Consent to receive text messages is not required for any purchases. Text STOP at any time to cancel. Message and data rates may apply. View our Terms & Conditions and Privacy Policy.