Search

Don’t Forget Hazmat Registrations Are Due By June 30!

Posted on 5/15/2012 by James Griffin

Q. Does a company always need to register with the DOT if it ships hazardous materials?
 
A. Not everyone who ships or carries hazmat needs to register the activity with the DOT. Only those who transport, or offer for transport, any quantity of high-consequence material, or large quantities of any hazardous material need to file paperwork and pay fees.
 
With few exceptions, any person who offers for transportation or transports in commerce any of the following must register:
 
  • Any highway route-controlled quantity of a Class 7 (radioactive) material, as defined in 49 CFR 173.403;
  • More than 25 kg (55 lbs.) of a Division 1.1, 1.2, or 1.3 (explosive) material in a motor vehicle, rail car, or freight container;
  • More than 1 L (1.06 qt.) per package of a material extremely toxic by inhalation material (Division 2.3, Hazard Zone A or Division 6.1, PG I, Hazard Zone A);
  • A hazardous material in a bulk packaging, container, or tank having a capacity equal to or greater than 13,248 L (3,500 gal.) or more than 13.24 cubic meters (468 cubic ft.); or
  • A quantity of hazardous materials that requires placarding. [This is the most common triggering condition.]
Government agencies, farmers, and certain foreign entities are partially exempt from the registration program. [49 CFR 107.606 and 601(b)]
 
DOT Hazmat RegistrationIf, during a registration period, you ship or transport even a single shipment that meets the above criteria, then your business must register with the DOT. Registration periods begin July 1 and extend to June 30 of the following year. Registrations must be updated annually and are due to the DOT by June 30 to cover your activities during the next registration period. The registration notifies the DOT what sort of shipments you will be carrying or offering during the next year.
 
In addition to providing the DOT with information about your hazmat shipping activities, you must also pay a fee as part of your registration. The yearly fees for registration, including a $25 processing fee, are:
 
  • $275 for small businesses or not-for-profits, and
  • $2,600 for all others.
Registrations must be filed on DOT Form F5800.2. You can do this through the mail or online.
 
References: 49 CFR Part 107 Subpart G—“Registration,” 49 USC 5108
 

Tags: DOT, hazmat shipping

Find a Post

Compliance Archives

Lion - Quotes

Lion's online training is more comprehensive, has better slides, and is a superior training experience than what I would get from other trainers.

Robert Brenner

District Environmental Manager

The workshop covered a lot of information without being too overwhelming. Lion is much better, more comprehensive than other training providers.

George Alva

Manufacturing Manager

I can't say enough how pleased I was with this course! Everything finally makes sense.

Kim Graham

Lab Manager

The course was very well structured and covered the material in a clear, concise manner.

Ian Martinez

Hazmat Shipping Professional

Best instructor ever! I was going to take my DOT training w/a different provider, but based on this presentation, I will also be doing my DOT training w/Lion!

Donna Moot

Hazardous Waste Professional

I was recently offered an opportunity to take my training through another company, but I politely declined. I only attend Lion Technology workshops.

Stephanie Gilliam

Material Production/Logistics Manager

I think LION does an excellent job of any training they do. Materials provided are very useful to my day-to-day work activities.

Pamela Embody

EHS Specialist

Very good. I have always appreciated the way Lion Tech develops, presents and provides training and materials.

John Troy

Environmental Specialist

The instructor was very very informative, helpful, understandable and pleasant. This course answered many questions I had, being new to this industry.

Frances Mona

Shipping Manager

Excellent. I learned more in two days with Lion than at a 5-day program I took with another provider.

Francisco Gallardo

HES Technician

Download Our Latest Whitepaper

This report details major changes for hazardous waste generators from US EPA’s Generator Improvements Rule, as well as the latest updates from states that are still working to adopt new, stricter Federal requirements.

Latest Whitepaper

By submitting your phone number, you agree to receive recurring marketing and training text messages. Consent to receive text messages is not required for any purchases. Text STOP at any time to cancel. Message and data rates may apply. View our Terms & Conditions and Privacy Policy.