Search

How to Create an Integrated Contingency Plan

Posted on 10/1/2018 by James Griffin, CDGP

Drum_Spill_1.jpgAn integrated contingency plan (ICP) is a plan to respond to contingencies that integrates the requirements of multiple government agencies into one combined document.

A contingency can be a spill, release, fire, earthquake, oil spill, pipeline leak, traffic accident, or any other emergency condition that threatens the environment, public safety, employees in a workplace, or other specified subjects; and that would require an emergency response of some kind.

Catch expert-led RCRA training trusted by EHS professionals nationwide this month in Milwaukee, Cleveland, Pittsburgh, Detroit, Nashville, Atlanta, Orlando or Charlotte and Houston.

Integrating multiple mandates means that instead of having one emergency response plan for Fires in the inventory, and another for oil spills, and another for mechanical failures in waste storage; you have one plan that catalogs all the possible hazardous conditions, the risks, and what to do in case of various emergency conditions.


What Mandates Does the ICP Integrate?

The ICP concept was created by the government’s National Response Team in 1996. Even at that early date, the authorities recognized that they had already overloaded the regulated community with too many emergency plan mandates, including but not limited to:
 
  • Spill Prevention Control and Countermeasures (SPCC) for oil spills [40 CFR 112]
  • Pipeline Response Plans [49 CFR 194]
  • Risk Management Plans [40 CFR 68]
  • Process Safety Management (PSM) [29 CFR 1910.119]
  • Emergency Action Plans [29 CFR 1910.38]
  • Hazardous Waste Operations and Emergency Response [29 CFR 1910.120]
  • RCRA Contingency Planning for hazardous wastes [40 CFR 264 Subpart D, 265 Subpart D, 279.52]
  • and others
Each of these different programs has its own scope for who it applies to, what risks it protects against, and who it’s meant to protect. Each program has its own administrative requirements for recordkeeping, reporting, coordinating with local authorities, or certifying, reviewing, and amending the plan. Even things like what kind of equipment you need, or personnel training to respond to emergencies, can be different.
Hazmat_Tech_Entry_Team_Chlorine_Release_46326526.jpg
But, these different plans also overlap a great deal. Once you’ve got a plan in place to deal with potential releases of flammable liquids from raw material stored in tanks, it takes only a little more work to address potential releases of flammable liquids from hazardous waste storage tanks, for instance.

If you’re doing quarterly evacuation drills for the county fire marshal to meet fire safety mandates; who says that can’t count that towards your OSHA PSM mandated annual evacuation drill for poison gas leaks? Either way, you’re evacuating to protect employees from danger. If you’re installing secondary containment to prevent oil spills, it may only need a new coat of paint to also prevent releases of industrial caustic.

These are only a few examples.


How Do I Create an Integrated Contingency Plan (ICP)?

In 1996, the US EPA and other public safety authorities published some guidance on how to put together a One-Plan. You can find a copy here https://www.osha.gov/laws-regs/federalregister/1996-06-05-0

The main idea of this guidance is to proceed like so:
 
  1. Identify the scope of the plan’s coverage. What federal/state/local mandates is it intended to comply with?
  2. Establish a core plan, that addresses most of the requirements of most of the mandates as much as possible,
  3. Use Annexes to provide key supporting information, not in the core plan, for particular emergency response scenarios.

The 4 Stages of the Core Plan

The four stages of a "core plan" are as follows:
 
  1. Discovery—what actions should a person take to assess and recognize a problem, and whom should they notify and how
  2. Initial response—Notify the relevant authorities, establish a response system, asses the situation, protection of the vulnerable (public, workers, infrastructure), followed by mitigating and containing releases, and deploying resources throughout
  3. Sustained Actions—after initial emergency response, additional care is not often needed. If it is, consult appropriate annex
  4. Termination and Follow-up actions—orderly demobilization and continuity with reporting or other administrative requirements.
 

Online Now: 20+ Hours of EH&S Manager Training
Master EPA Compliance Anytime, Anywhere

computer-(1).jpgManaging site compliance with the many complex EPA programs that affect your business—from the Clean Air and Clean Water Acts to TSCA, EPCRA, CERLCA, and more—is a major challenge. If you’re new to the field or need an update on changing EPA rules, the Complete Environmental Regulations Online Course will help you quickly build in-depth expertise.

JOIN US LIVE! The 2018-19 nationwide schedule for the Complete Environmental Regulations Workshop is now available. Collaborate with other managers to identify the requirements that apply to your facility, ask the right questions, and make optimal decisions about EPA compliance.


 

Tags: emergency, hazardous materials management, hazardous waste, ICP, PSM, response

Find a Post

Compliance Archives

Lion - Quotes

Lion courses always set the bar for content, reference, and practical application. Membership and access to the experts is an added bonus.

John Brown, CSP

Director of Safety & Env Affairs

Lion is easily and consistently the best option for compliance training. I've learned new information from every instructor I've had.

Rachel Mathis

EHS Specialist

Lion's online training is more comprehensive, has better slides, and is a superior training experience than what I would get from other trainers.

Robert Brenner

District Environmental Manager

The instructor was probably the best I ever had! He made the class enjoyable, was humorous at times, and very knowledgeable.

Mary Sue Michon

Environmental Administrator

My experience with Lion training, both online and in the classroom, is that they are far better organized and provide a better sequential explanation of the material.

Robert Roose

Manager, Dangerous Goods Transportation

I think LION does an excellent job of any training they do. Materials provided are very useful to my day-to-day work activities.

Pamela Embody

EHS Specialist

This course went above my expectations from the moment I walked in the door. The instructor led us through two days packed with useful compliance information.

Rachel Stewart

Environmental Manager

The instructor was very knowledgeable and provided pertinent information above and beyond the questions that were asked.

Johnny Barton

Logistics Coordinator

I chose Lion's online webinar because it is simple, effective, and easily accessible.

Jeremy Bost

Environmental Health & Safety Technician

Very witty instructor, made the long times sitting bearable. One of the few training courses I can say I actually enjoyed.

John Hutchinson

Senior EHS Engineer

Download Our Latest Whitepaper

Decrease spill, release, and injury risk and increase savings with these "source reduction" strategies to prevent unused chemicals from becoming regulated as hazardous waste.

Latest Whitepaper

By submitting your phone number, you agree to receive recurring marketing and training text messages. Consent to receive text messages is not required for any purchases. Text STOP at any time to cancel. Message and data rates may apply. View our Terms & Conditions and Privacy Policy.