Search

September 1 Deadline for RCRA SQGs to Re-Notify EPA

Posted on 8/20/2021 by Roseanne Bottone

September 1, 2021 is the first deadline for small quantity generators (SQGs) of hazardous wastes to re-notify EPA (or their state environmental agency) of their activities. EPA’s 2016 RCRA Generator Improvements Rule added a provision to the hazardous waste regulations to require re-notification from SQGs once every four years on September 1 (40 CFR 262.18(d)(1)).

Small quantity generators must re-notify EPA using Form 8700-12, also called a Site ID Form (or the state equivalent). Electronic reporting via the MyRCRAID system is an option in some states.

By requiring re-notification from small quantity generators every four years, EPA can “maintain more accurate data into the future for outreach, compliance assistance, and oversight activities.”

Why EPA Requires Notification from Generators

Generators must not treat, store, dispose of, transport, or offer for transportation, hazardous waste without having first received an EPA identification number. They must apply for the ID number for their site by submitting the Site ID Form.

Among other information required on the form, regulated persons notify the EPA of their generator status–large, small, or very small. 

What About Large Quantity Generators?

Large quantity generators of hazardous waste, or LQGs, are required to re-notify EPA of their status by March 1 of each even-numbered year using Form 8700-12. LQGs may submit this re-notification as part of the Biennial Report required under 40 CFR 262.41. 

Updated Annual RCRA Training

The addition of a re-notification mandate for SQGs is just one of the many substantive RCRA updates that generators must identify to stay in compliance in 2022. Others include stricter contingency planning requirements, updated container marking standards, new rules for satellite areas, and more.   

Get RCRA training that covers the latest rules for generators. These updated online courses guide you through the updated rules you must know to keep your facility in compliance with RCRA. 

RCRA Hazardous Waste Management

RCRA Hazardous Waste Management Refresher  

Tags: biennial reporting, Form 8700-12, hazardous waste, hazardous waste reporting, RCRA, small quantity generator

Find a Post

Compliance Archives

Lion - Quotes

I attended training from another provider and learned absolutely nothing. Lion is much better. Hands down.

Nicole Eby

Environmental Specialist

The workshop covered a lot of information without being too overwhelming. Lion is much better, more comprehensive than other training providers.

George Alva

Manufacturing Manager

I have attended other training providers, but Lion is best. Lion is king of the hazmat jungle!!!

Henry Watkins

Hazardous Waste Technician

These are the best commercial course references I have seen (10+ years). Great job!

Ed Grzybowski

EHS & Facility Engineer

I like the consistency of Lion workshops. The materials are well put together and instructors are top notch!

Kevin Pylka

Permitting, Compliance & Environmental Manager

The price was reasonable, the time to complete the course was manageable, and the flexibility the online training allowed made it easy to complete.

Felicia Rutledge

Hazmat Shipping Professional

I was able to present my scenario to the instructor and worked thru the regulations together. In the past, I attended another training firm's classes. Now, I have no intention of leaving Lion!

Diana Joyner

Senior Environmental Engineer

The course was very informative and presented in a way that was easily understood and remembered. I would recommend this course.

Jeffrey Tierno

Hazmat Shipping Professional

Lion's course was superior to others I have taken in the past. Very clear in the presentation and the examples helped to explain the content presented.

George Bersik

Hazardous Waste Professional

I have over 26 years of environmental compliance experience, and it has been some time since I have attended an environmental regulations workshop. I attended this course as preparation for EHS Audits for my six plants, and it was exactly what I was looking for.

Frank Sizemore

Director of Regulatory Affairs

Download Our Latest Whitepaper

Hazardous materials shipment rejections bear a big cost. Use this guide to end operational and logistical disruptions that severely impact your bottom line.

Latest Whitepaper

By submitting your phone number, you agree to receive recurring marketing and training text messages. Consent to receive text messages is not required for any purchases. Text STOP at any time to cancel. Message and data rates may apply. View our Terms & Conditions and Privacy Policy.