Lion.com will be offline from 11:00 PM ET on March 22, to 6:00 AM ET on March 23, for updates. For trouble logging in or accessing Lion.com after this period, please call 862-271-4199 or 888-LION-511.
Search

EPA Proposes Modifications to 2008 Definition of Solid Waste Rule

Posted on 7/6/2011 by James Griffin

Today, the U.S. Environmental Protection Agency announced a proposed rule to modify the 2008 Definition of Solid Waste (DSW) rule. The DSW rule had been intended to promote recycling of “hazardous secondary materials.” The EPA’s proposed modifications are in response to concerns raised by the Sierra Club and other environmental groups through various court actions.
 
The 2008 rule established a group of materials that are excluded from the definition of solid waste (and thus excluded from hazardous waste regulation) if recycled in certain ways. Environmental groups felt that the wording of the exclusions allowed the possibility of materials “falling through the cracks” and not being managed correctly, thus increasing the risk of those materials having a detrimental effect on the environment and human health at large. The current modification is intended “to ensure that the rule, as implemented, encourages reclamation in a way that protects human health and the environment from the mismanagement of hazardous secondary materials.”
 
The proposed modifications include:
 
  • Creating a new category of “hazardous recyclable materials.” Per the proposed rule preamble, “a hazardous recyclable material is a hazardous waste that is recycled. Unlike “hazardous secondary materials,” hazardous recyclable materials have clearly been discarded and therefore are always solid wastes.”
  • Replacing the exclusion currently found at 40 CFR 261.4(a)(24) and (25) for hazardous secondary materials that are transferred from the generator to other persons for the purpose of reclamation with new rules for “hazardous recyclable materials,” to be located in 40 CFR 266 and to include:
    • Management of hazardous recyclable materials according to current Subtitle C (hazardous waste) requirements, including counting towards generator status, manifesting shipments, and the acquisition of permits for storage;
    • Submission of a biennial notification by March 1 of every even-numbered year;
    • Extension of the accumulation time period for generators of hazardous recyclable materials to ONE YEAR, so long as a reclamation plan is created and followed;
    • Marking of containers with the words “hazardous recyclable material” rather than “hazardous waste;” and
    • Establishment of an upper limit on the amount of hazardous recyclable material accumulated at the generator’s site at any one time.
  • Revising the exclusion for hazardous secondary materials reclaimed under the control of the generator currently found at 40 CFR 261.4(a)(23) ◦Adding a regulatory definition of “contained” to 40 CFR 260.10;
    • Making notification to the U.S. EPA or the authorized State agency a condition of the exclusion; and
    • Increasing recordkeeping for speculative accumulation and reclamation under toll manufacturing agreements.
 
The proposed rule also includes revisions to the definition of “legitimate recycling,” currently found in 40 CFR 260.43. The revisions would make all legitimacy factors mandatory, would create a petition process for those situations where a given factor is not met but the recycling activity is still legitimate, and would require documentation proving the recycling legitimacy factors have been met. The EPA is also proposing that the definition of legitimate recycling be applied to all recycling activities regulated under 40 CFR 260-266, which would be a major change from the way the definition of legitimacy is currently applied.
 
The EPA is also seeking comment on a number of alternate standards, especially in regards to the management standards for hazardous recyclable materials. These include the creation of a “hazardous recyclable materials manifest” as an alternative to the existing hazardous waste manifest or adopting shipping paper requirements similar to those for universal wastes.
 
A prepublication version of the proposed rule and other information about the DSW rule are available on EPA’s Web site.
 

Tags: hazardous, new rules, RCRA, recycling, waste

Find a Post

Compliance Archives

Lion - Quotes

Excellent class, super instructor, very easy to follow. No rushing through material. Would like to take his class again.

Lawrence Patterson

EH&S Facility Maintenance & Security Manager

The instructor clearly enjoys his job and transmits that enthusiasm. He made a dry subject very interesting and fun.

Teresa Arellanes

EHS Manager

I have over 26 years of environmental compliance experience, and it has been some time since I have attended an environmental regulations workshop. I attended this course as preparation for EHS Audits for my six plants, and it was exactly what I was looking for.

Frank Sizemore

Director of Regulatory Affairs

I really enjoy your workshops. Thank you for such a great program and all the help Lion has provided me over the years!

George Chatman

Hazardous Material Pharmacy Technician

The instructor's energy, enthusiasm, and knowledge of the subject make the class a great learning experience!

Brian Martinez

Warehouse Operator

I have attended other training providers, but Lion is best. Lion is king of the hazmat jungle!!!

Henry Watkins

Hazardous Waste Technician

Course instructor was better prepared and presented better than other trainers. Course manual and references were easier to use as well.

Marty Brownfield

Hazardous Waste Professional

I tried other environmental training providers, but they were all sub-standard compared to Lion. I will not stray from Lion again!

Sara Sills

Environmental Specialist

Excellent course. Very interactive. Explanations are great whether you get the questions wrong or right.

Gregory Thompson

Environmental, Health & Safety Regional Manager

Lion does a great job summarizing and communicating complicated EH&S-related regulations.

Michele Irmen

Sr. Environmental Engineer

Download Our Latest Whitepaper

Your hazmat paperwork is the first thing a DOT inspector will ask for during an inspection. From hazmat training records to special permits, make sure your hazmat documents are in order.

Latest Whitepaper

By submitting your phone number, you agree to receive recurring marketing and training text messages. Consent to receive text messages is not required for any purchases. Text STOP at any time to cancel. Message and data rates may apply. View our Terms & Conditions and Privacy Policy.