Search

Emergency Preparedness in Haz Waste Satellite Areas

Posted on 2/4/2020 by Roseanne Bottone

“…the [Generator Improvement Rule (GIR)] enhances the safety of facilities, employees, and the general public by improving hazardous waste risk communication and ensuring that emergency management requirements meet today’s needs…revisions are designed to improve emergency responders’ ability to respond to events…”

– US Environmental Protection Agency

US EPA published the Generator Improvements Rule in the Federal Register on November 28, 2016 with an effective date of May 30, 2017. All authorized states are required to adopt elements of the GIR that are more stringent than their own regulations within two years.

As of February 4, 2020, about half of the states have yet to adopt the Generator Improvements Rule. Technically speaking, states that have not yet adopted the more-stringent RCRA requirements are out of compliance. If your state has not yet adopted the new rule, they will soon.   

To check the status of the Generator Improvements Rule in your state, visit EPA’s dedicated web page here.

New RCRA Emergency Preparedness Requirements 

Among the many notable changes in the revised RCRA regulations are provisions that bolster emergency preparedness requirements for both small and large quantity generators.

The small quantity generator (SQG) rules for emergency procedures at 40 CFR 262.16(b)(9) state, “The small quantity generator complies with the following conditions for those areas of the generator facility where hazardous waste is generated and accumulated.”

For large quantity generators (LQGs), §262.17(a)(6) redirects to 40 CFR Part 262, Subpart M for preparedness, prevention, and emergency procedures. Like the SQG requirements, the applicability rules in §262.250 state that “The regulations of this subpart apply to those areas of a large quantity generator where hazardous waste is generated or accumulated on site.

For both LQGs and SQGs, EPA has made clear that “where hazardous waste is generated or accumulated” includes points of generation, satellite accumulation areas (SAAs), and central accumulation areas (i.e., 180-day and 90-day storage areas).

Emergency Preparedness in Satellite Areas

In addition to posting emergency information next to the phone (for SQGs) and including satellite areas in their written contingency plans (for LQGs), all generators must now provide/install specified emergency equipment at satellite accumulation areas.

Required emergency equipment includes:
  • An internal communication or alarm system;
  • A device, such as a telephone (immediately available at the scene of operations) or a hand-held two-way radio, capable of summoning emergency assistance from local police departments, fire departments, or state or local emergency response teams;
  • Portable fire extinguishers, fire control equipment (including special extinguishing equipment, such as that using foam, inert gas, or dry chemicals);
  • Spill control equipment;
  • Decontamination equipment; and
  • Water at adequate volume and pressure to supply water hose streams, or foam producing equipment, or automatic sprinklers, or water spray systems.

Where to Put Emergency Equipment

Here’s the good news: EPA says that “SQGs and LQGs may determine the most appropriate locations for emergency equipment, when it is not possible or unsafe to have the equipment located immediately next to the generating equipment" (§262.16(b)(8)(ii)/ §262.252).

That provides generators with some room for commonsense flexibility.

Lion continues to track the adoption of the Generator Improvements Rule by state.

2020 RCRA Hazardous Waste Training

For training on the latest RCRA regulations, join an expert instructor for the RCRA Hazardous Waste Management Workshop, coming soon to a city near you.
 
Houston, TX Feb. 10–11
San Antonio,TX Feb. 19–20
Phoenix, AZ Feb. 24–25
Denver, CO Feb. 27–28
Portland, OR Mar. 2–3
Salt Lake City, UT Mar. 9–10
Grand Rapids, MI Mar. 26–27
Chicago, IL Mar. 30–31

US EPA requires annual RCRA training for hazardous waste personnel. Lion makes it easy to meet your RCRA training mandate in a variety of formats—nationwide public workshops, convenient online courses, live webinars, and on-site training.

Browse all RCRA training options here to find the course that fits your needs, your schedule, and your learning style.
 

Tags: contingency planning, emergency preparedness, generator improvements rule, hazardous waste management, RCRA

Find a Post

Compliance Archives

Lion - Quotes

Attending Lion Technology classes should be mandatory for every facility that ships or stores hazmat.

Genell Drake

Outbound Lead

Excellent. I learned more in two days with Lion than at a 5-day program I took with another provider.

Francisco Gallardo

HES Technician

I have been to other training companies, but Lion’s material is much better and easier to understand.

Mark Abell

Regional Manager

The instructor clearly enjoys his job and transmits that enthusiasm. He made a dry subject very interesting and fun.

Teresa Arellanes

EHS Manager

Well designed and thorough program. Excellent summary of requirements with references. Inclusion of regulations in hard copy form, as well as full electronic with state pertinent regulations included is a great bonus!

Oscar Fisher

EHS Manager

Lion was very extensive. There was a lot of things that were covered that were actually pertaining to what I do and work with. Great Job. I will be coming back in three years!

Tony Petrik

Hazmat Shipping Professional

I was recently offered an opportunity to take my training through another company, but I politely declined. I only attend Lion Technology workshops.

Stephanie Gilliam

Material Production/Logistics Manager

Lion Technology workshops are amazing!! You always learn so much, and the instructors are fantastic.

Dorothy Rurak

Environmental Specialist

Amazing instructor; real-life examples. Lion training gets better every year!

Frank Papandrea

Environmental Manager

The instructor was very dedicated to providing a quality experience. She did her best to make sure students were really comprehending the information.

Stephanie Venn

Inventory Control Specialist

Download Our Latest Whitepaper

Your hazmat paperwork is the first thing a DOT inspector will ask for during an inspection. From hazmat training records to special permits, make sure your hazmat documents are in order.

Latest Whitepaper

By submitting your phone number, you agree to receive recurring marketing and training text messages. Consent to receive text messages is not required for any purchases. Text STOP at any time to cancel. Message and data rates may apply. View our Terms & Conditions and Privacy Policy.